PROCEDURE OF REPOWERING A WIND FARM

Patent number:

ES2537586

Cantabria.svg
No items found.

Procedure for repowering an initial wind farm, configured to maximize the reuse and/or expansion of infrastructures and/or construction elements, by which, each time that it advances in time and ends one year of the useful life of the initial wind farm, an annual dynamic analysis is carried out that includes, among other stages, determining the trend lines of the average electrical power of the wind turbines installed in the region where the wind farm is located and the relationship between the power of the wind turbines and their dimensions. Rotor; for the remaining years of useful life, carry out and determine, with the previously estimated data, the theoretical design of a re-powered wind farm such that the maximum amount of infrastructures and/or construction elements coincide between said park and the initial wind farm built; obtain the definitive optimum date to carry out the repowering in the year in which the greatest coincidence is obtained; and realize the repowering of the wind farm through the design and in the optimum date obtained. (Machine-translation by Google Translate, not legally binding)

Countries:
Spain
Regions:
Cantabria
Centers:
UNIVERSIDAD DE CANTABRIA
Other entities:
Sectors:
Energy
Subsectors:
Engines, pumps, turbines, IT methods for management, Y02E10/72, Y02E10/728
TRL Level:
TRL 3 – experimental proof of concept
BRL Level:
PDF Link:
Download here
Video Link:
Watch it here
Sustainable Development Goal:
Applications

Método para optimizar el beneficio económico de un parque eólico, planificando su futura repotenciación y maximizando la reutilización de infraestructuras. El método es válido además de a futuros parques eólicos aún sin construir en un emplazamiento concreto, a aquellos parques eólicos ya construidos, de tal forma que en función del ciclo de vida tecnológico de los aerogeneradores se obtiene el año para realizar la repotenciación del parque eólico que implique mayor beneficio económico y máximo aprovechamiento de infraestructuras y elementos constructivos.

Comments

Other related patents

Energy

SYSTEM AND METHOD FOR REDUCING THE POWER REQUIRED IN THE START-UP STAGE FOR SUPERCRITICAL WATER OXIDATION PLANTS

Countries
Spain
Know more
Other
Energy
Aerospace
Automotive & Rail

SYSTEM AND METHOD FOR DETECTING ICE FORMATION ON A BODY

Countries
Spain
Know more
Energy
Telecom
Other

VOLTAGE OR CURRENT HARMONICS MEASUREMENT METHOD FOR ELECTRICAL LINES APPLIED WITH TRANSFORMED WAVELET PACKETS

Countries
Spain
Know more
Get back to patents directory